Leaders In Trenchless Technology

DON'T EXCAVATE REHABILITATE

Innerseal

PLIA Innerseal.jpg

Perma-Liner™ has developed an easy and non-intrusive way to correct Lateral Pipeline and Main Line Sewer Pipeline connection problems.

InnerSealAfter_002.jpg

The InnerSeal™ Lateral Connection is another quality product released by Perma-Liner™ for the rehabilitation of the lateral to mainline connection point. The unique materials are designed to be placed from within the main sewer pipeline and launched into the lateral creating a water tight seal at the main / lateral connection point. The lateral is also lined at the same time correcting any damaged pipe sections and preventing roots from growing into the pipeline

QualityPipeServicesII_001.jpg

The InnerSeal™ resin technology is 100% solids epoxy. This resin formulation is ambient cure and can be modified for hot water or steam curing. The ambient cure formulation has excellent bonding properties in all pipe materials and does not contain styrene. Our Epoxy resin does not shrink and will seal off water infiltration during the application.

The InnerSeal™ Connection System can rehabilitate from 150mm to 60mm sewer mains with 75mm to 225mm lateral tye-ins. This system is user friendly and allows the installer to provide a structural liner connection with 22’s, 45’s and 90 degree connections


QualityPipe3_001.jpg

The InnerSeal™ installation is controlled from the operator’s station inside the enclosed “turn key” trailer system. The operator can control the direction of the repair train and position the train into the lateral connection. The operator’s station also allows full control of the inversion pressure in order to secure the liner properly against the host pipelines.

pic_innerseal_11.jpg

Perma-Liner™ InnerSeal™ Advantages
  • Ease of Installation
  • Ambient Cure
  • Meets ASTM F 1216 Specs
  • Eliminates Roots Intrusion
  • Repairs Lateral Connections
  • Re-Line Diameter Transitions
  • 75mm to 225mm Laterals
  • Average 3 to 4 Installs a Day
  • Seals with Existing CIPP Lining
  • Formulated Epoxy Resins
  • Non Styrene Resin
  • 3rd Party Independent Tested
  • Stops Infiltration / Ex-Filtration
  • Seal Open Joints
  • 150mm to 600mm Mains
  • True Inversion Process
  • Minimum Design Life 50 Years
  • No Digging in the Street


certified-installer 2012.jpg

AUSSIE FLAG.png

Perma-Liner Industries Australia on LinkedIn facebook.pngtwitter.png youtube.png


footer_02.jpg

© 2012 Perma-Liner Industries Australia All Rights Reserved