Now you can service
pipelines in diameters from 50mm to 225mm in less then a day and in
most cases less then 3 hours! This "true" inversion method allows
the Perma-Lateral™ lining materials to negotiate 22's, 45's and
sweeping 90's with ease. Our liner material allows our installers
to line through 100mm – 150mm transitions without changing the
structural properties of the liner. Only Perma-Lateral™
liner materials have a reinforced scrim to eliminate stretch during
the inversion process. The reinforcement scrim (patent pending)
allows the liner to invert smoothly through the existing pipeline
while preventing the liner from stretching. Our installers are able
to line an existing pipeline without inverting into city sewer
mains.
The Perma-Lateral™ Lining
System / Cured-In-Place Pipe (CIPP) is approved for lining existing
50mm – 225mm diameter pipelines. Perma-Lateral™ Lining Materials
meet their strict non-stretch liner requirements. Only Perma-Liner™
provides non-stretch lining materials. The Perma-Lateral™ liner
allows the installer to invert the liner through the existing
building sewer pipeline to the city main sewer connection without
stretching into the city sewer main. Normal felt liners can stretch
into the city sewer main and cause blockages that require emergency
digging and/or robotic cutting devices. The Perma-Lateral™ liner
and calibration tube is manufactured in 100m length rolls. Our
logistics department handles your order and delivers the products
to meet your schedule. Our Perma-Lateral™ transition liner is
manufactured to your job specification. The Perma-Lateral™
transition liner is manufactured to your exact length.