|
The Perma-Liner™ Pull-In-Place
System is 100% trenchless. No digging up floors, landscaping, or
tearing up walls. The versatility of this system allows lining
22's, 45's, 90's and vertical stacks with ease while stopping
and starting anywhere in the line. Now you can service pipelines in
diameters from 75mm to900mm in less than a day and in most cases
less than 5 hours with the new Perma-Liner™ Pull-In-Place System.
The Navi™-Liner can also be supplied in 100mm-150mm transitions
without changing the structural properties of the liner.
The Navi™-Liner, rubber
bladder, release plastic and tag line are manufactured in 50m
length rolls. Our logistics department handles your order and
delivers the products to meet your schedule. Our Navi™ transition
liner is manufactured to your job specification and to your exact
length.

The Perma-Liner™ Pull-In-Place
ambient cure resin is formulated to meet the installer's needs.
Perma-Liner™ has formulated its resin for all working temperatures.
The Perma-Liner™ 100% solids epoxy resin will provide you plenty of
working time with a 3 hour cure time. The epoxy is pre-formulated
and shipped to you in 20 kg containers. The formulation is a 2-part
mix. You simply measure the quantity of resin needed and introduce
it into the liner. There's no waste of materials. This system is
user friendly!

No Excavation: No torn up
walls, floors, landscaping or trees.
Versatility: Ability to line
around multiple bends and vertical stacks while stopping and
starting anywhere in the line.
Perma-Liner™ Pull-In-Place
Advantages.
- 100% Trenchless
- Formulated Epoxy Resins
- Re-Line 22's, 45's & Sweeping 90's
- NSF Standard 14 Approved
- Eliminate Root Intrusion
- Bridge Missing Pipe Sections
- Increase Flow Efficiency
|
- Minimum Design Life 50 Years (Tested)
- Non-Woven / No Stretch Liner
- Seal Open Joints
- Prevent Pipe Failure
- Reline 4" to 6" Transitions
- Stop Infiltration / Ex-Filtration
- IAPMO Certified
|


© 2010 Perma-Liner Industries Australia All Rights Reserved |